Resources

Current product, installation, and operations materials

Current materials were revised in October 2026. Downloadable PDFs are Korean originals. Historical records are separately labeled and do not describe current installation requirements.

Product Guide 2026.10 개정판

IRON MIND Product Overview

Explains the integrated hardware, AI runtime infrastructure and development management product. Korean original, revised October 2026.

Current2026.10Korean PDF

Recommended for: Project owners, PMO, development leads, and security reviewers

  • Explains the integrated rack, GPU server, storage, network, AI runtime and development software product.
  • Connects hardware and software delivery, environment-specific configuration and optional integrations.
  • Summarizes scoped internal v59 checks and the current customer manual.
Security Guide 2026.10 개정판

Security and Operations Review

Explains local accounts, role-based access, audit records, and recovery procedures. Korean original, revised October 2026.

Current2026.10Korean PDF

Recommended for: Security reviewers, infrastructure architects, and operations teams

  • Explains local accounts, role-based access, audit records, and recovery procedures.
  • SSO and external malware scanning are optional integrations; built-in file restrictions are not antivirus scanning.
  • Distinguishes internal verification from external certification and customer acceptance.
AI Operations 2026.10 개정판

AI Development Governance Guide

Connects approved model access with project policies and review workflows. Korean original, revised October 2026.

Current2026.10Korean PDF

Recommended for: PMO, development leads, QA, and security reviewers

  • Connects approved model access with project policies and review workflows.
  • Records AI-assisted drafts, execution results, and human review decisions.
  • Requires a customer-approved model server and a working network route.
Cost Planning 2026.10 개정판

Deployment Cost Review Guide

Defines the cost items to review for on-premise and cloud deployment. Korean original, revised October 2026.

Current2026.10Korean PDF

Recommended for: Budget owners, project managers, and procurement teams

  • Defines the cost items to review for on-premise and cloud deployment.
  • Reviews hardware, software, model operations and integration as components of one deployment cost.
  • Uses customer inputs for estimation; does not guarantee cost savings or ROI.
Deployment Checklist 2026.10 개정판

Deployment Readiness Checklist

Reviews OS, compute, storage, network, certificates, and model reachability. Korean original, revised October 2026.

Current2026.10Korean PDF

Recommended for: Installation leads, infrastructure operations, and project administrators

  • Reviews OS, compute, storage, network, certificates, and model reachability.
  • Covers installation, local accounts, project setup, reboot, and recovery checks.
  • Customer manual: 27 chapters, 145 steps, and 177 captures; downloadable documents are in Korean.
Workflow Scenario 2026.10 개정판

Public-Sector Project Workflow Scenario

Presents a project workflow scenario using test data. Korean original, revised October 2026.

Current2026.10Korean PDF

Recommended for: Public-sector project owners, PMO, and development leads

  • Presents a project workflow scenario using test data.
  • Connects requirements, WBS, artifact versions, QA decisions, and project closure.
  • A demonstration scenario is not a real customer deployment or acceptance result.
Historical reference materials

Retained records of earlier designs and tests. They do not establish current specifications, performance, certification, or installation requirements.

[Archive] Implementation self-assessment

2026-06 · 과거 기록

Historical record. Not evidence of current specifications, performance, certification, or installation requirements. Use current materials first. Original Korean PDF is retained.

[Archive] NIS mapping notes

2026-06 · 과거 기록

Historical record. Not evidence of current specifications, performance, certification, or installation requirements. Use current materials first. Original Korean PDF is retained.

[Archive] Security control design

2026-06 · 과거 기록

Historical record. Not evidence of current specifications, performance, certification, or installation requirements. Use current materials first. Original Korean PDF is retained.

[Archive] External quality review checklist

2026-06 · 과거 기록

Historical record. Not evidence of current specifications, performance, certification, or installation requirements. Use current materials first. Original Korean PDF is retained.

[Archive] Historical E2E test results

2026-06 · 과거 기록

Historical record. Not evidence of current specifications, performance, certification, or installation requirements. Use current materials first. Original Korean PDF is retained.

[Archive] Historical load test results

2026-05 · 과거 기록

Historical record. Not evidence of current specifications, performance, certification, or installation requirements. Use current materials first. Original Korean PDF is retained.

[Archive] Previous installation guide

2026-06 · 과거 기록

Historical record. Not evidence of current specifications, performance, certification, or installation requirements. Use current materials first. Original Korean PDF is retained.

[Archive] Previous closed-network operations guide

2026-05 · 과거 기록

Historical record. Not evidence of current specifications, performance, certification, or installation requirements. Use current materials first. Original Korean PDF is retained.

Need a deployment-specific review package?

Share your infrastructure, model access, network, and project workflow so we can recommend the right materials.

Contact TRUE AI